Spraylast coating inspection
Manufacturing a good anilox requires 100% control over production process.
For this reason, Simec and his partner (certified ISO 9001) have decided to carry out random checks twice a day (at the beginning and at the end of each manufacturing cycle) on each of the 4 systems dedicated to anilox production.
The results of these inspections are annexed to the std. digital certification of the anilox sent to the customers: when a customer chooses Simec as a supplier, it is routine to receive also this certification, besides the std. one about anilox dimensions and engr.
Procedure for Spraylast coating inspection
Specimen cutting, immersion into resins and polishing
Checking of anchorage and porosity
Checking of hardness and specimen
Simec Concept
Partnership with Flame Spray
Spraylast coating
Raw materials
Thermal Spray equipments
PN protection against corrosion
Contacts
Simec Group Srl
Starlox Division
Tel: +39 0331 393900
Fax: +39 0331 323382
Email: starlox@simecgroup.com
Coating finish